Welcome To India's Leading Port


Kandla port plays a major role in the country's international trade. Having notched up a string of success, it has emerged as a forerunner, and has carved a niche for itself, by its steady growth and economy of operations.


"Kandla port will emerge as a vibrant, world class, multi-cargo port offering services at multiple locations and having a dominant share of regional cargo by virtue of its ability to effectively leverage its locations and land resources for facilitating growth of economic activities and investments, with the objective of developing mutually beneficial and sustainable linkages with port based industries and users, thereby making Kandla the driver of economic growth in the region"

Clariffications to querries and Corrigendum to Appointment of Environment Consultant for Obtaining Environmental and CRZ Clearance for the proposed Creation of Water Front Oil Jetties 8,9,10 and 11 and development of Land for associated facilities, at Old Kandla”Dated 21.07.2016 and 12.07.2016 NEW

ADDENDUM NO.8 NIT FOR RFQ: Global Invitation for Qualification for “REPOSITIONIN G OF 13TH MULTIPURPOSE CARGO BERTH AT KANDLA PORT ON BOT BASIS”Dated 14.07.2016

ADDENDUM NO.8 NIT FOR RFQ: Global Invitation for Qualification for “REPOSITIONIN G OF 15TH MULTIPURPOSE CARGO BERTH AT KANDLA PORT ON BOT BASIS” Dated 14.07.2016

Corrigendum II and Corrigendum I to Appointment of Consultant for Preparation of Detailed Project Report for Setting up of Coastal Cargo Berth in Kandla Port on the location adjacent to Cargo Berth No. 16 Dated 18.07.2016

PRE-BID CLARIFICATIONS FOR RFP FOR APPOINTMENT OF ADVISOR FOR “STUDY OF OIL PIPELINES & IMPROVING THE NETWORK FOR EFFICIENT, SMOOTH HANDLING OF LIQUID CARGO AT KANDLA PORT”Dated 11.07.2016

PRE-BID CLARIFICATIONS FOR E-TENDER CUM E-AUCTION FOR ALLOTMENT OF LAND ADMEASURING 2772 SQ. MTRS. FOR THE PURPOSE OF SERVICE STATION ON AS IS WHERE IS BASIS AT KANDLA ON 30 YEARS LEASE BASIS Dated 01.07.2016

Appointment of Consultant for the work of Mechanization of handling of Fertilizers at Kandla Port”Dated 01.07.2016

Sprinkling system inside Cargo Jetty area for Coal Dust Suppression in coal yard”Dated 01.07.2016

Addendum II to Appointment of Programme Management Consultant for Development of Smart Industrial Port City (SIPC) at Kandla – Gandhidham – Adipur Complex”Dated 01.07.2016

Prebid Clarifications for the work of RFP for Appointment of Technical Consultant for Detailed Design Consultancy Services for Civil, Structural, Architechtural, Water Supply System, Sanitation System, Landscaping, General Electrical and Building Services for Construction of Multipurpose AC Hall for 1000 pacs at Gopalpuri, .”Dated 29.06.2016

Bid Clarification for Grant of License for Supply, Installation, Commissioning, Operation and Maintenance of 6 Nos. of 100 MT or above owned / hired Mobile Harbour Cranes at Berth No.7 to 9 (panels 46-75) inside Kandla Port for a period of 10 years for handling the cargo on common user basis .”Dated 28.06.2016

REPLIES TO PRE-BID MEETING HELD ON 21.06.2016 FOR APPOINTMENT OF PROGRAMME MANAGEMENT CONSULTANT FOR DEVELOPMENT OF SMART INDUSTRIAL PORT CITY (SIPC) AT KANDLA – GANDHIDHAM – ADIPUR COMPLEX” .”Dated 24.06.2016

CORRIGENDUM FOR APPOINTMENT OF AN INDEPENDENT ENGINEER FOR THE PROJECT OF “DEVELOPMENT, OPERATION AND MAINTENANCE OF CONTAINER TERMINAL AT BERTH NOS. 11 AND 12 AT KANDLA PORT ON PPP MODE” .”Dated 18.6.2016

Pre Bid Clarifications by KPT for the Design, Development and Maintenance of KPT Website and date extended till 25.05.2016 .”Dated 04.05.2016

ADDENDUM NO.7 NIT FOR RFQ: Global Invitation for Qualification for “REPOSITIONIN G OF 13TH MULTIPURPOSE CARGO BERTH AT KANDLA PORT ON BOT BASIS”Dated 15.06.2016

CORRIGENDUM 01 TO FOR Appointment of Consultant for Up-gradation and Modernization of existing ancillary facilities at Cargo Jetty Area of Kandla Port Trust at New KandlaDated 17.06.2016

ADDENDUM NO.7 NIT FOR RFQ: Global Invitation for Qualification for “REPOSITIONIN G OF 15TH MULTIPURPOSE CARGO BERTH AT KANDLA PORT ON BOT BASIS” Dated 15.06.2016

MINUTES OF THE PRE-BID MEETING FOR E-TENDER CUM E-AUCTION FOR ALLOTMENT OF 26 NOS. OF PLOTS BETWEEN KANDLA AND VILLAGE JUNGI FOR PRODUCTION OF SALT ON 30 YEARS LEASE ON AS IS WHERE IS BASIS, HELD ON 28.12.2015 AT 11.30 HOURS AT BOARD ROOM, A.O. BUILDING, GANDHIDHAM..”Dated 01.06.2016

PreBid Clarifications by KPT for Appointment of Environment Consultant for Obtaining Environmental and CRZ Clearance for the proposal of Smart Industrial Port City(SIPC) within Gandhidham Kandla Adipur Complex located at Gandhidham of Kandla Port Trust .”Dated 30.05.2016

ADDENDUM NO.6 NIT FOR RFQ: Global Invitation for Qualification for “REPOSITIONIN G OF 13TH MULTIPURPOSE CARGO BERTH AT KANDLA PORT ON BOT BASIS”Dated 12.05.2016

ADDENDUM NO.6 NIT FOR RFQ: Global Invitation for Qualification for “REPOSITIONIN G OF 15TH MULTIPURPOSE CARGO BERTH AT KANDLA PORT ON BOT BASIS” Dated 12.05.2016

PreBid Clarification for Up Gradation of Barge Handling Facilites at Bunder Basin, Electrification of 5 Hector Area .”Dated 04.05.2016

ADDENDUM ADN PREBID CLARIFICATION FOR E-TENDER CUM E-AUCTION OF ALLOTMENT OF LAND FOR PURPOSE OF LIQUID STORAGE TANKS (STORAGE & HANDLING OF BITUMEN) [INCLUDING STRUCTURES] ON 30 YEARS LEASE ON AS IS WHERE IS BASIS AT OLD KANDLA.”Dated 28.04.2016

PreBid Clarification Replacement of Slew Bearing of Crane No. 1 of 16T and Crane No. 3 of 25T capacity MBE ELL Crane including painting of entire steel structure at inside Cargo Jetty Area.”Dated 28.04.2016

Corrigendum for PreBid meeting exteded for E – Tender Cum E – Auction for work of Allotment of 05 NOS. Plots on 05 years lease basis for barge repairing / beaching on as is where is basis at Kandla”Dated 15.04.2016

Corrigendum-XI to Grant of License for Supply, Installation, Commissioning, Operation and Maintenance of 6 nos. of 100 MT or above owned / hired Mobile Harbour Cranes at Berth No.7 to 9 inside Kandla Port for a period of 10 years for handling the cargo on common user basis”.EL/AC/MHCHIRE/2015 Dated 11.04.2016 Dated 11.04.2016

AMENDMENT NO.4A to the RFQ for "Upgradation, Maintenance and Operation of existing Barge Jetty at Tuna, Kandla Port” on BOT basis under PPP Mode for a concession period of thirty (30) years". Dated 30.01.2016

 

 

Read Corrigendum...


  
Read all Tenders
Read all Tenders
Special Achievments

1.Kandla Port Trust (KPT) has a prominent winner at the prestigious Maritime and Logistics Awards (MALA) - 2013, organized by Exim India, on the evening of Friday the 6th September 2013, consequently fourth time in a row.j

 

 

 

 

 

 


    Draft Citizen Charter uploaded!!



Read more

PPP Project Targets and Achivements

Read All News
 
 
Go to the Top