PHYSICAL  EFFICIENCY  PARAMETERS OF KANDLA PORT TRUST FROM 2005-06 TO 2009-10.
A.  AVERAGE  PRE-BERTHING  DETENTION (ON PORT A/C) IN DAYS
SR CATEGORY
2005-06 2006-07 2007-08 2008-09 2009-10
 
1 BREAK BULK  VESSELS 1.46 2.8 1.97 2.24 2.65
2 DRY  BULK  VESSELS 1.54 3.39 3.07 2.61 1.86
3 LIQUID  TANKERS
KANDLA 0.25 0.18 0.66 0.33 0.24
VADINAR 0.00 0 0 0 0
ESSAR 0.00 0 0 0 0
4 CONTAINER  VESSELS 0.41 0.23 0.09 0.16 0.07
OVERALL 0.82 1.47 1.36 1.17 0.95
B.  AVERAGE  TURN  ROUND  TIME (ON PORT A/C). IN DAYS
SR CATEGORY          
2005-06 2006-07 2007-08 2008-09 2009-10
 
1 BREAK BULK  VESSELS 4.49 6.07 4.81 5.51 6.38
2 DRY  BULK  VESSELS 4.88 6.79 5.86 5.22 4.30
3 LIQUID  TANKERS
KANDLA 1.61 1.38 2.03 1.64 1.58
VADINAR 1.53 1.61 1.57 1.58 1.51
ESSAR 0 1.89 1.55 1.5 1.31
4 CONTAINER  VESSELS 1.92 1.75 1.18 0.84 0.87
OVERALL 3.04 3.69 3.37 3.15 2.89
C.  AVERAGE  PER SHIP  BERTHDAY  OUTPUT (IN TONNES).#
SR CATEGORY          
2005-06 2006-07 2007-08 2008-09 2009-10
1 BREAK BULK  VESSELS 2926 3008 3173 3110 3362
2 DRY  BULK  VESSELS 5258 6213 6815 7651 9321
3 LIQUID  TANKERS
KANDLA 6703 7243 6643 5983 6735
VADINAR 102490 90677 89107 88914 94816
ESSAR  0 14578 20976 25466 25259
4 CONTAINER  VESSELS 5633 6613 9453 9875 9200
TEUs 362 423 596 636 555
OVERALL 8700 9843 11082 12998 13372
#  EXCULDING   STREAM HANDLING.
D.  PERCENTAGE  OF IDLE TIME  TO TOTAL STAY AT BERTH(IN %).
SR CATEGORY          
2005-06 2006-07 2007-08 2008-09 2009-10
1 BREAK BULK  VESSELS 12 13 13 13 11
2 DRY  BULK  VESSELS 14 14 14 16 15
3 LIQUID  TANKERS
KANDLA 26 29 26 30 28
VADINAR 12 11 13 12 12
ESSAR 0 36 23 22 20
4 CONTAINER  VESSELS 15 26 19 46 33
OVERALL 16 12 17 20 18
E.  NUMBER  OF  CARGO VESSELS HANDLED.
SR CATEGORY          
2005-06 2006-07 2007-08 2008-09 2009-10
1 BREAK BULK  VESSELS 505 595 557 448 437
2 DRY  BULK  VESSELS 461 449 598 636 663
3 LIQUID  TANKERS
KANDLA 780 820 888 805 971
VADINAR 126 163 196 242 244
ESSAR 0 27 124 165 206
4 CONTAINER  VESSELS 252 264 235 221 255
OVERALL 2124 2318 2598 2517 2776
F.  BERTH  OCUUPANCY (IN %)
SR CATEGORY          
2005-06 2006-07 2007-08 2008-09 2009-10
1 DRY CARGO BERTHS 91 90 86 78 81
2 LIQUID CARGO BERTHS 57 55 66 61 73
3 SBM'S  AT VADINAR 28 29 30 36 35
4 ESSAR VADINAR 0 62 67 76 67
OVERALL 74 72 72 67 72
G.  AVERAGE  GANGSHIFT  OUTPUT  OF  SHORE LABOUR (IN TONNES)
         
YEAR 2005-06 2006-07 2007-08 2008-09 2009-10
IN TONNES 595 590 662 684 698
H  TRAFFIC HANDLED AT KANDLA PORT FROM 2004-05 TO 2010-11 (UPTO 31-01-2011)
YEAR  2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 (UPTO 31-01-2011)
TRAFFIC  41.60 45.91 52.98 64.89 72.22 79.50 68.76